File size: 2806 kB Views: 2782 Downloads: 61 Download links: Mirror link
UFC 3-601-02 Fire Protection Systems Inspection, Testing, and Maintenance, 10-07-2021. UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities.UFC 3-535-01 Visual Air Navigation Facilities, with Change 3. Date: 04-11-2017. Change / Revision Date: 05-21-2021. Series: 3 - DISCIPLINE-SPECIFIC CRITERIA.This UFC supersedes UFC 3-535-01, 17 November 2005. UFC 3-535-02, Design Drawings for Visual Air Navigation. Facilities.This document provides drawing details for design and construction of individual components of visual navigation facilities.UFC 3-260-02a, Pavement Design for Airfields, June 01. UFC 3-260-03a. UFC 3-535-02, Visual Air Navigation Facilities and Design Drawings (Draft)***.UFC 3-535-02 Design Drawings for Visual Air Navigation.UFC 3-535-01 Visual Air Navigation Facilities, with Change 3Unified Facilities Criteria (UFC) - WBDG
UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities, 05-21-2018, PDF · CCR · UFC 3-260-17 Dust Control for Roads, Airfields and Adjacent Areas.UFC 3-535-02, Design Drawings for Visual Air Navigation Facilities, supplements this document by providing guidance and detailed information.UFC 3-201-02 Landscape Architecture, with Change 1, 04-29-2020, 02-09-2021, PDF · CCR. UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities.UFC 3-201-02 Landscape Architecture, with Change 1, 04-29-2020, 02-09-2021, PDF · CCR. UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities.UFC 3-535-01 Visual Air Navigation Facilities. UFC-3-535-02-010-XX-01 Design Drawings for Visual Air Navigation Facilities.Unified Facilities Criteria (UFC) - WBDGDESIGN DRAWINGS FOR VISUAL AIR NAVIGATION.Unified Facilities Criteria (UFC) - WBDG. juhD453gf
The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and. Provide retro-reflective markings per UFC 3-535-02.This UFC supersedes UFC 3-230-01 dated November 2012. Energy and sustainability: Use UFC 1 200-02. Coordinate with UFC 3-535-01.UFC 3UFC 3--580580--10N, Design: Navy and Marine10N, Design: Navy and MarineCorp. UNIFIED FACILITIES CRITERIA (UFC) UFC 3-535-01 17 November 2005 UNIFIED.. Engineering UFC 3-201-02 Landscape Architecture UFC 3-210-10 Low Impact. UFC 3-535-01 Visual Air Navigation Facilities UFC 3-540-01 Engine-Driven.Comply with UFC 3-535-01. 2-2.5. CATHODIC PROTECTION SYSTEMS. Comply with UFC 3-570-02N for the Navy and UFC 3-570-02A for the Army. 2-3.UFC 3-501-01 provides overall electrical engineering criteria,. ANSI Z535.4 for safety sign criteria. 3-2.2. Panelboards.UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard, with Change 3, 04-01-2014, 05-18-2021 ; UFC 3-535-01 Visual Air Navigation.UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities, 05-21-2018, PDF · CCR · UFC 3-260-17 Dust Control for Roads, Airfields and Adjacent Areas.Superseding: UFC 3-530-01, Design: Interior, Exterior Lighting and Controls, April. Refer to UFC 1-200-02 for Daylighting requirements.统一设施标准(UFC) 订阅统一设施标准(UFC) ; UFC 3-535-01视觉空气导航设施,改变2, 04-11-2017, 04-06-2021, PDF · CCR ; UFC 3-535-02视觉空中导航设施设计图纸, 05-21-.Air Force UFC 3-260-02, Pavement Design for Airfields. Army UFC 3-260-02,. they are sited in accordance with UFC 3-535-02 and/or UFC 3-535-01:.. Facilities (UFC 3-535-01) (U.S. Dept. of Defense, 2005) - Pavement Design for Airfields (UFC 3-535-02) (U.S. Dept. of Defense, 2001).UFC 3-201-02 Landscape Architecture, with Change, 04-29-2020, 02-09-2021. UFC 3-535-02视觉空气导航设施的设计图纸, 05-21-2018, PDF.UFC 3-535-01. Adhere to UFC 1-300-02 Unified Facilities Guide. Specifications (UFGS) Format Standard when editing this guide specification or preparing new.UFC 3-601-02 8 September 2010 UNIFIED FACILITIES CRITERIA (UFC) OPERATION AND MAINTENANCE: INSPECTION, TESTING, AND MAINTENANCE OF FIRE.they are sited in accordance with UFC 3-535-02 and/or UFC 3-535-01: ▫ Approach lighting systems. ▫ Visual approach slope indicator (VASI).The United States Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC) and the Office of the Air Force Civil Engineer are.conversion of the November 1990 document into UFC 3-340-02 was. 535. Figure 3-6. Location of Symmetrical Yield Lines for Two-Way Element.UFC 3-535-01 Visual Air Navigation Facilities. UFC 1-300-02 UFGS Format Standard. UFC 4-152-01 Design: Piers and Wharves. UFC 3-250-01 Pavement Design for.the Airfield Lighting Guide was extracted from UFC 3-535-01,. AFI 31-117, Arming and Use of Force by Air Force Personnel, 02 February.are not unified with UFC 3-535-01, Visual Air Navigation Facilities. The Pavements. 3-260-04.18-. 02, Airfield Marking Waiver Procedures.aircraft; d) adds Aircraft Wash Racks content passed from UFC 4-211-02; e) updated Compass. Calibration Pad requirements.Change No. Date. Location. This UFC supersedes UFC 3-260-01, dated 17 November 2008. construction and siting criteria, see UFC 3-535-01.Unified Facilities Criteria (UFC). In Progress: 3-500-04. Battery Rooms. 3-500-10. Electrical Design. 3-535-02. Airfield Lighting, (Vol II). 3-550-01.UFC documents provide planning, design, construction, sustainment, restoration,. UFC 3-535-02 Design Drawings for Visual Air Navigation Facilities.